01218cam a2200217 a 4500008004100000020001800041020001500059020001800074020001500092040000800107050002600115100002100141245006000162260005500222300001900277505060500296505001700901650003800918650002300956650002100979101119s2011 enka b 001 0 eng  a9780566091667 a0566091666 a9781409428121 a1409428125 aSDU00aHD69.P75bH912 I 20111 aHulett, David T.10aIntegrated cost-schedule risk analysis /cDavid Hulett. aFarnham, Surrey ;aBurlington, VT :bGower,c2011. a218 p. :bill.0 aWhy conduct risk analysis? -- Cost risk analysis: the basics -- What is Monte Carlo analysis and how does it apply? -- Collecting high quality data on cost risk methods and challenges -- The correlation between common project element costs -- Using risk register risks to drive the cost risk analysis -- Preparing for integrated cost and schedule risk analysis -- Essentials of integrated cost and schedule risk analysis -- Integrated analysis method and case study basic results -- Integrated cost and schedule risk analysis advanced results -- Summary of integrated cost and schedule risk analysis.0 aHKBU Library 0aProject managementxCost control. 0aCosts, Industrial. 0aRisk assessment.