| 000 | 01323cam a2200253 a 4500 | ||
|---|---|---|---|
| 008 | 101119s2011 enka b 001 0 eng | ||
| 020 | _a9780566091667 | ||
| 020 | _a0566091666 | ||
| 020 | _a9781409428121 | ||
| 020 | _a1409428125 | ||
| 040 | _aSDU | ||
| 050 | 0 | 0 |
_aHD69.P75 _bH912 I 2011 |
| 100 | 1 |
_aHulett, David T. _9217105 |
|
| 245 | 1 | 0 |
_aIntegrated cost-schedule risk analysis / _cDavid Hulett. |
| 260 |
_aFarnham, Surrey ; _aBurlington, VT : _bGower, _c2011. |
||
| 300 |
_a218 p. : _bill. |
||
| 505 | 0 | _aWhy conduct risk analysis? -- Cost risk analysis: the basics -- What is Monte Carlo analysis and how does it apply? -- Collecting high quality data on cost risk methods and challenges -- The correlation between common project element costs -- Using risk register risks to drive the cost risk analysis -- Preparing for integrated cost and schedule risk analysis -- Essentials of integrated cost and schedule risk analysis -- Integrated analysis method and case study basic results -- Integrated cost and schedule risk analysis advanced results -- Summary of integrated cost and schedule risk analysis. | |
| 505 | 0 | _aHKBU Library | |
| 650 | 0 |
_aProject management _xCost control. _9217106 |
|
| 650 | 0 |
_aCosts, Industrial. _95995 |
|
| 650 | 0 | _aRisk assessment. | |
| 900 | _a = C.1 SDU | ||
| 942 |
_cGBE _2lcc |
||
| 999 |
_c111555 _d111555 |
||